Toyo Tunnel and its pathways of access Section I
  • tunel toyo
Project Description
antioquia

Description
Toyo Tunnel Project covers the works required for the development of Santa Fe Variant - Cañasgordas, which is part of the Main road of Urabá (National Route 62), in a 353 km route that communicates the cities of Medellín and Turbo. stretch 1, will start from the municipality of Cañasgordas in a approximate length of 18.3 km, formed by 973 bridges, 4.97 km of opencast routes and 12.3 km of tunnels. From those Km, 9.75 km of it corresponds to the Toyo tunnel.


Service Provided
Final studies and designs or Phase lll, for the section 1 of the preconstructive phase of Toyo tunnel and its access routes - Antioquia al Mar Consortium.


Covered Length
+5000m.


Implementation Period
Año 2016/17.

Project Details
  • Client Cons. Antioquia al Mar
  • Date 10 Mar 2022