Skip to main content
Cisneros II Dual Carriageway
  • Cisneros
Project Description
antioquia

Dual carriageway Cisneros- Loboguerrero - Buga - Buenaventura

Description
This project included the construction of 10.5 kilometers of dual carriageway, viaducts and five tunnels in both directions with lengths between 420 and 1440 meters. Thanks to these works, travel time to Buenaventura, Colombia's main port on the Pacific, was reduced by 40 minutes.

This was a continuation of the first phase, which was in charge of the ECC Consortium, formed by Conconcreto, Estyma S.A. and Constructora Solarte Solarte. Between 2009 and 2014, these companies built 14 kilometers of dual carriageway, 16 tunnels totaling 9,200 meters, as well as 25 bridges and viaducts with a total length of 2,845 meters.


Services
Technical assistance in tunnels for Contract No. 2189, Interventory to execute the construction of Phase II of the dual carriageway Cisneros (PR49+000) - Loboguerrero (PR63+000) sector (PR51+000) to (PR61+500) of the Buga - Buenaventura highway, including design adjustments, social, property and environmental management.


Covered Length
1440m


Execution Time
2016.

Project Details
  • Client Cons. Cisneros Loboguerrero
  • Date 08 Mar 2022
  • Categories