Skip to main content
Ibagué - Cajamarca - Tr. 2 y 3
  • segunda calzada
Project Description
tolima

Second roadway Ibagué - Cajamarca - Sections 2 and 3

Description
Design for the construction of the hydraulic structures and the adequacy of the slope through cast concrete and the installation of a geomembrane, either cast or installed, on the surface and its subsequent coating.


Services
Consulting services for the development of hydraulic, hydrology and scour studies and designs (HHS studies) for the two roadways of sections 2 and 3 of the Ibagué - Cajamarca Second Roadway Project.


Covered Length
-


Execution Time
2015.

Project Details
  • Client Concesionaria San Rafael
  • Date 08 Mar 2022
  • Categories